At the moment our days are just not long enough for everything we have to do. After the long trip Pitufa needs quite some attention, the boiler was leaking and Christian removed the electric heater element that was rusted through (followed by happy bilge cleaning as 25 litres of freshwater had drained onto the engine twice). Yesterday was a 9 hour Pfaff-day (that’s the name… Continue reading »
2016
26
Sep